We successfully delivered a 22.40m span of a steel pipe bridge to our client, Base Titanium Limited in Kwale. The 66m bridge consisting of 3 spans – 21.73m, 22.40m, 21.73m – will be assembled onāsite via splice connections and lifted into position as a full span once all the sections are delivered.
Busy day at our SECO shipyard in Mombasa as our pride, the Kobelco 250 Ton crane was preparing to depart for Suswa in the Kenyan Rift valley. The crane will be used in the loading and offloading of 9 transformers and related accessories belonging to Siemens by Spedag Interfreight East Africa Ltd., this is in